Industrial complex Torres Novas Industrial Zone

Industrial complex Torres Novas Industrial Zone1 / 13
2 / 13
3 / 13
4 / 13
5 / 13
6 / 13
7 / 13
8 / 13
9 / 13
10 / 13
11 / 13
12 / 13
13 / 13
Click to see bigger photos
  • Property typeWarehouse
  • Sale € 2.625.000
  • Area32446 m²
  • CountySantarém
  • TownTorres Novas
  • Parish
    Torres Novas (Santa Maria, Salvador e Santiago)
  • LocationIndustrial (santa Maria)
  • REFCY-67019-MCCT62417
-
-
32446 m²
32446 m²
-1
-
I
 

Description

We are pleased to present this large-scale industrial complex, strategically located in the Torres Novas Industrial Zone, one of the most important logistics hubs in central Portugal.

With a total area of 32,486sqm, the property consists of several industrial buildings, offering operational versatility for:

• Manufacturing

• Logistics and distribution

• Large-scale warehousing

• Multi-tenant business park

Supporting Infrastructure

The complex also features a 234sqm annex, including:

• Reception area

• Cafeteria

• Social facilities

• Restroom facilities

A functional solution that ensures appropriate conditions for operational and administrative teams.

Strategic Location

One of this property’s key advantages is its location:

• Just a few minutes from the A23 interchange

• Direct connection to the A1

• Excellent access to the Lisbon, Porto, and Spain regions

This connectivity places the property in a strategic location for both domestic and international operations.

️ Strengths

• Large size and scalability

• Established industrial zone

• Excellent road access

• Potential for profitability or operational expansion

Key infrastructure installed at the factory:

1 - Natural gas pipeline with a supply capacity of 2,000,000 m³ per year (PRM);

2 - Medium-voltage (MV) network to the transformer station (PT), installed capacity 1,250 kVA + 630 kVA = 1,880 kVA + QGBT installed adjacent to the PT substation;

3 - Water supply pipeline (Ribatejo Water System), installed capacity 10 m³/h;

4- Well for groundwater extraction:

Pipe diameter (casing): 200 mm

Static water level: -40 m

Dynamic water level: 80 m

Available operating flow rate: 60 m³/h

Installed pump: Flow rate 30 m³/h

5- Concrete drainage pipe network in the area surrounding the building, diameter 400 mm;

6- Access roads to the building paved with rounded pebbles bound with asphalt. (There is no gravel on the access road to the factory.)

For more information or to schedule a visit, please feel free to contact me.

Features:
Outdoor parking
Alarm
Piped Water
Exterior Views
Video Surveillance

Property Features

  • Outdoor parking
  • Alarm
  • Piped Water
  • Exterior Views
  • Video Surveillance

Location

Industrial (santa Maria), União das Freguesias de Torres Novas (Santa Maria, Salvador e Santiago), Torres Novas, Santarém

Contacts

CY MaisConsultores #Digital
AMI License: 23677
Website: maisconsultores.pt/imoveis/andre-carrasco
Telephone: